Calidad SA
Are you a quality consultant? Get a public profile, client referrals, and free access to all quality tools.
Learn more

SPC Factory Simulator: Juice Bottling Line

Interactive SPC training simulator. Monitor a juice bottling line, detect out-of-control conditions, investigate factory logs, and find the root cause of a fill volume shift.

15 min readIntermediate

SPC Factory Simulator

Step into the shoes of a quality engineer. Can you catch the problem before bad parts ship?

You Are the Quality Engineer

It's 6:00 AM. You just clocked in for first shift at a juice bottling plant. You're responsible for monitoring fill volume on a high-speed filling line that produces 330 mL mango nectar bottles. The night shift operator says everything ran fine, but you know better than to take anyone's word for it -- you check the data. Your control chart is your eyes on the process.

Today's Assignment

Your filling line has been running stable, but something is about to change. A new ingredient lot just arrived, and a hidden process event will occur during your shift. Your job is to detect it on the control chart, stop production before underfilled bottles ship, dig through the factory logs to find the root cause, and annotate the chart like a real quality engineer would.

Machine
Filling Line 3
Part
Mango Nectar, 330 mL PET Bottle
Characteristic
Fill Volume
Unit
mL
LSL 328.000 Target 330.000 USL 334.000
How This Simulator Works
1
Watch the Chart
A live X-mR control chart plots one measurement every few seconds. The process starts stable. Watch for trends, shifts, or rule violations.
2
Stop Production
When you see something wrong, hit the red STOP button. The longer you wait, the more bad parts ship and the lower your score.
3
Investigate the Logs
After stopping, 5 factory logs appear: Raw Material, Operator, Maintenance, Environment, and Tooling. The root cause is hidden in one of them. You must find it.
4
Annotate and Score
Select the root cause, mark the chart where the problem started, and write an annotation. You'll be scored on detection speed, investigation accuracy, and annotation quality.
Don't wait too long! If too many out-of-spec parts ship before you stop production, the scenario fails with a customer complaint. Just like real life.
The chart will begin plotting immediately. Stay alert.

Try It Yourself

Want to check YOUR process capability? Paste your data into our free tool.

Open SPC Quick Check

Still have questions? Ask QC-Coach

Tap a question below or type your own

QC-Coach
AI quality coaching assistant

Get personalized AI insights on your analysis. QC-Coach explains your results, identifies issues, and suggests next steps.

Found this useful? Share it with a colleague.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.